Exceptional technology

We have mastered the technology of building panel houses, which we have been developing with partners from Germany, Holland and Norway for over 20 years.

Exceptional technology

We have mastered the technology of building panel houses, which we have been developing with partners from Germany, Holland and Norway for over 20 years.

Technology

is exceptional because:

We produce and assemble prefabricated panels – frame houses according to reliable and time-tested technology.

Technology

is exceptional because:

We produce and assemble prefabricated panels – frame houses according to reliable and time-tested technology.

Benefits

01.

Warm houses

Wind resilient, no cold bridges, minimal losses on the foundations, technically correctly installed windows and doors, so the house meets the heat resistance demands of the client

02.

Completeness

The interior and exterior decoration is done before the house was assembled; windows and doors are still installed during production, basins and washbasins, electrical wiring and boxes, alarm sensors, window openings are made before the house is installed;

03.

Everything is planned

Planning beforehand – at the design stage, we advise you to build the house correctly; it is best to have 3 sides at the design stage – the developer, the architect and the contractor – then there is no need to redesign the previous job.

01.

Warm houses

Wind resilient, no cold bridges, minimal losses on the foundations, technically correctly installed windows and doors, so the house meets the heat resistance demands of the client;

02.

Completeness

The interior and exterior decoration is done before the house was assembled; windows and doors are still installed during production, basins and washbasins, electrical wiring and boxes, alarm sensors, window openings are made before the house is installed;

03.

Everything is planned

Planning beforehand – at the design stage, we advise you to build the house correctly; it is best to have 3 sides at the design stage – the developer, the architect and the contractor – then there is no need to redesign the previous job.

100%

According to the plan

90%

Eco materials

50%

Faster and efficient

Exceptional technology

Exceptional technology